Great Result is all that matters –
Well-Do Produce
Cocoa Beans always are used for –
Prepare-Shape-ValueAdd-Pack Machines
Process Line
Continuous & Efficient Equipment by SnLuck –
Continuous Drying plant
Produce Instruction
Model | SL-CP-L2-WB-AF22-BR (Continuous type) |
---|---|
Type of drying | 4 hours per cycle. Daily expect to get 888.89 Kg well dried. Yield Rate: 8.89%. Each hour operate fresh: 416.67Kg. |
Full Load Range | 500Kg TILE stacking to 1000Kg PILE stacking. 2 Load Module with 16 convey-dry layers. Valid dry-load area: 100SQM. |
Size | 5.8*2.2*2.2 Meter. | Volume: 28.07 Cubic Meter. | Occupied Area: 12.76 Sqm. Convey-dry layer: 2 meter wide, 3-10 mm thickness. Layer Gap: 100mm. |
Power | Convey power: 0.5Kw. Convey Speed: 18.0m/hr. Air power: 2Kw. Generate airpressure: 520.0Pa, with air speed: 4m/s. |
Yield | 37.23% |
Batch & Reliable Equipment by SnLuck –
Batch Drying plant
Produce Instruction
Model | SL-BP-L4-WB-AF11-BR (Batch type) |
---|---|
Type of drying | 8 hours per batch. Each batch load fresh: 2743.63Kg. Daily expect to get 888.89 Kg well dried. Yield Rate: 8.89%. |
Full Load Range | 1000Kg TILE stacking to 2000Kg PILE stacking. 4 Load Modules with 432 trays in 24 trolleys. Valid dry-load area: 200SQM. |
Size | 9.8*2.2*2.2 Meter. | Volume: 47.43 Cubic Meter. | Occupied Area: 21.56 Sqm. Unit Trays Size: 800*600*30mm. Trays Gap: 100mm. |
Power | Air power: 1Kw. Generate airpressure: 584.0Pa, with air speed: 4m/s. |
Yield | 37.23% |
The most 3 benefits on Cocoa Dryer -
Higher & Lower
Higher Return & Lower Expense.
TemperatureHumidityPeriodAirflow Manage
Drying Controls
40-60℃
15-65%
4-8 hr
Tile load
Support more than just delivery
Service & Support
- 1
Seamless transaction: Minimizes administrative hassles for a smooth purchase.
- 2Timely delivery: Guarantees equipment arrival as scheduled for prompt production or operation start.
- 3Efficient installation and commissioning: Provides technical support for quick and correct equipment setup.
- 4Comprehensive training: The 15-day training equips users to operate and maintain the equipment effectively.
- 5Prompt technical issue resolution: Enables quick troubleshooting and minimizes downtime.
- 6Risk-free initial operation: The three-month trial operation helps identify and address potential issues for stable performance.
- 7Cost-effective maintenance: Offers maintenance advice and cost-effective spare parts and servicing.
- 8Continuous improvement: Enhances equipment and services based on feedback for better value.
- 9Long-term partnership: Builds a reliable relationship for ongoing support and mutual success.